How Do I Install an EV Charger at My Apartment Building in NZ?

Featured Image

Quick Answer

Installing an EV charger at an apartment building in New Zealand starts with body corporate approval, followed by a site assessment to check the building’s electrical capacity, then a feasibility report before installation begins. Unlike a standalone house, apartment installations affect shared infrastructure and common areas, so the process runs through a specialised team rather than a single electrician visit. evse.nz runs this process end to end for residents, body corporates, and property developers.

  • Step 1: Get body corporate approval, since the installation affects common areas and shared electrical infrastructure
  • Step 2: Submit a site enquiry so the building’s car park count, layout, and expected demand can be reviewed
  • Step 3: Have a site inspection carried out to assess existing capacity and cable run distances
  • Step 4: Receive a feasibility report and proposal outlining the recommended approach and cost
  • Step 5: Proceed to installation once the proposal is approved

Why Apartment Installations Are Different

A single-house installation usually involves one electrician, one switchboard, and one car park. An apartment building involves shared infrastructure, multiple stakeholders, and often limited spare electrical capacity, which changes the process significantly.

  • Body corporate approval: required before work begins, since installation affects common areas and shared systems
  • Limited electrical capacity: many older buildings were not designed to support multiple EV chargers charging at once
  • Cost allocation: who pays for infrastructure upgrades, individual chargers, and ongoing electricity use needs to be agreed in advance
  • Fair access: as more residents buy EVs, charging capacity needs to be shared fairly rather than allocated on a first-come basis

The Installation Process

Step Stage What Happens
1 Enquiry Submit details about the building, number of car parks, and expected charging demand
2 Initial contact A specialised apartment team member reviews the enquiry and gets in touch to discuss the site
3 Site inspection A site visit assesses existing electrical capacity, cable run distances, and car park layout
4 Feasibility report and proposal A report outlines the recommended approach, the work involved, and the associated costs
5 Installation Once the proposal is approved, installation is scheduled and carried out by licensed electricians

Timing and requirements at each step vary depending on the building’s size, existing electrical capacity, and car park layout.

Choosing an Infrastructure Approach

Apartment buildings generally choose between a few different approaches to rolling out EV charging, depending on current demand and future growth.

Approach How It Works Best For
Backbone infrastructure first Shared cabling and capacity installed once, with individual chargers added per car park as needed Buildings expecting gradual EV uptake among residents over time
Individual charger installation Each resident pays for a charger connected to their own car bay Buildings with existing spare electrical capacity and a small number of current EV owners
Shared or managed chargers A smaller number of chargers shared across multiple car parks, managed through software Buildings with limited capacity or fewer dedicated car parks per unit

How Individual Resident Charging Works

For a resident wanting a charger connected to their own car bay, the charger is typically powered through a dedicated circuit breaker, with cabling routed to the charger location via cable tray. Each installation needs to comply with the building’s by-laws and requires body corporate approval, since it affects shared electrical systems even when the charger itself serves only one car park.

Managing Shared Charging Fairly

Where multiple residents charge from a shared electrical supply, a load management system keeps the building’s total electrical demand within safe limits, without requiring a full infrastructure upgrade. Charging software also allows the body corporate or property manager to monitor usage, apply a tariff rate, and bill individual residents for the electricity they use, so charging costs are recovered fairly rather than absorbed into shared building expenses.

  • Software tracks each charging session and calculates cost based on electricity consumed.
  • The body corporate or property manager retains visibility over charging activity across the building.
  • Billing can be set according to a tariff rate chosen by the body corporate.
  • Load management protects existing electrical infrastructure from being overloaded as more residents add chargers.

Who Is Involved

  • Residents: individual apartment owners wanting a charger for their own car bay
  • Body corporate or strata manager: approves installations affecting common areas and by-laws
  • Property developers: plan EV charging infrastructure into new apartment builds from the design stage
  • Specialised installation team: assesses the site, prepares the feasibility report, and carries out installation

Getting Started

Residents, body corporates, and property developers can start the process through evse.nz by submitting a site enquiry. A specialised apartment team then reviews the request and arranges a site inspection where required, before providing a feasibility report and formal proposal. This turnkey approach is designed to remove the need for the body corporate or an individual resident to manage electrical planning, load management, and billing setup on their own.

Frequently Asked Questions

Do I need body corporate approval to install an EV charger at my apartment?

Yes. Since apartment charger installations affect common areas and shared electrical infrastructure, body corporate or strata approval is required before work can begin.

Can every resident install their own charger?

It depends on the building’s existing electrical capacity. Buildings with spare capacity may support individual chargers per car park, while others need backbone infrastructure or a shared, managed charging setup first.

Who pays for the electricity used by apartment EV chargers?

This is agreed by the body corporate. Charging software tracks usage per resident and can bill according to a tariff rate the body corporate chooses, so costs are recovered from the residents using the chargers.

Does an apartment building need an electrical upgrade to support EV charging?

Not always. A site inspection determines whether the existing electrical infrastructure can support the proposed chargers, or whether a load management system or upgrade is needed first.

How long does the process take from enquiry to installation?

Timing depends on the building’s size and complexity. A feasibility report and proposal follow the site inspection, and installation is scheduled once the proposal is approved by the body corporate.

Share this Article

How much does it cost to charge an Electric Car

What surprises most people when looking at the feasibility of swapping over to an electric vehicle is just how much of a cost saving they make. EVSE New Zealand had a look at the numbers and I think you will agree, there is a significant cost saving when comparing filling up a regular car and […]
Read More

OCPP: 4 letters to remember when investing in EV charging stations

What is OCPP? The Open Charge Point Protocol (OCPP) is an open-source communication protocol for networked electric vehicle chargers. It can be considered a syntax language in which EV chargers are able to communicate between electric vehicle charging points and central control systems. As an open-source protocol, anyone can access and contribute to it. OCPP […]
Read More

Find the right charger

Tell us about your car and home to see recommendations.

Get the best price

Stocking the best Electric Car products from the World’s leading brands.

Reliability

All of our EVSE products are compliant with New Zealand & International standards.