Owner's Corporation EV Charging

EVSE's end-to-end solutions for STRATA/OC, enables all apartment buildings in Australia to be equipped with EV charging capabilities

EV Charging for units and high-rise apartments

 

Over 2.5 million Australians live in apartments and as EV uptake continues to ramp up, many Owners Committees will find themselves tackling the task of fitting apartment buildings with EV chargers.

Apartment buildings have a range of unique challenges to navigate when installing EV chargers, ranging from:

  • Limited electrical capacity
  • Significant upfront capital costs
  • Design complexity
  • Installation and Deployment
  • Maintenance and ongoing servicing
  • Billing Support

Let EVSE simplify your transition to electric vehicle charging with our turnkey solutions, making it easy and hassle-free.

 

Estimate Bg
GET AN ASSESSMENT

OC Apartment Charging

Complete the enquiry form to get started on chargers at your apartment building

Proposal
Hardware
Software
Installation
Strata Apartments

Enquiry Process

 

Step 1: Fill enquiry form – Fill the form with the details of your site so we can evaluate the next step

Step 2: EVSE contacts you – Our specialised apartment team will contact you to discuss your completed form

Step 3: Site Inspection – Depending on your building, a site visit may be required to finalise the requirements and price for your EV charger installation

Step 4: Feasibility/ Proposal – Once the costs have been calculated you will receive a quote for your EV charger installation

Step 5: Installation – Once you’ve accepted your quote your installation will be scheduled and completed

Our Solution 

 

EVSE will conduct a thorough assessment of your complex to evaluate the feasibility of your envisioned infrastructure. Based on this assessment, we will present design options that incorporate the following:

  • Load management
  • EV charger installation
  • Supporting EV infrastructure such as EVDBs, Ocular Load Controller and Communications Network
  • Reimbursement plans

Common Approaches to EV Charging

 

Common approaches to the implementation of EV charging in common areas come in 2 ways:

  • Visitor charging bays
  • Installation of chargers for each private residential parking bay

Understanding what you require can help guide EVSE in providing our customers with a solution that solves their short- or long-term electrification needs.

Frequently Asked Questions

 

What is EV Infrastructure? 

EV infrastructure will need to be in place to support mass residential charging. This can include switchboard upgrades, distribution boards (EVDB), cable tray, communication upgrades and load control installations. A site assessment will determine which of these will need to be included in our approach to installation.

 

Do I Need to Upgrade My Electrical Infrastructure?

EVSE will approach our feasibility to avoid upgrading any electrical infrastructure, with an assessment of whether the apartment is capable of supporting EV charging in its current state. We have hardware and software to assist in load managing, which is the primary concern when it comes to mass EV charging implementation.

 

Is All Infrastructure Owned by the Building?

The equipment, depending on who has paid for the infrastructure will be owned entirely by the payee. EVSE can be engaged for any further works, as well as for post-installation maintenance.

 

What Is the Average Charge Time for Each Option?

Depending on the active managing of the charger’s load – if full supply is available meaning no power limitations, the chargers can charge:
– 22kW – up to ~120-130km of range each hour
– 7kW – up to 40km of range each hour

This is dependent on the vehicle plugged in, some vehicles take 7kW single phase, 11kW three-phase and seldom 22kW three-phase.

 

Who is paying for power usage, how does the building recover these costs, and what is the kW rate that will be paid back to the building?

This depends on how the charger is being powered, after the tenant’s meter or via common infrastructure.

– If wired directly from their tenant meter, EV charger usage will outlined in the standard electricity bill

 

What is the warranty on EVSE’s infrastructure?

The hardware and installation come default with 2 year warranty if EVSE is at fault with the charger and installation.

 

How much will EV infrastructure cost?

An initial consultation and site inspection will need to be organised to determine costings around your chosen EV charger implementation. Each site varies vastly in terms of practicality of installation as well determining site specific conditions such as available supply and cable run distances.

 

I am not sure where to start.

Please click enquire now! A dedicated team member from the Apartments team will be in contact to assist

Our EV Solutions are Trusted by Some of the Region's Biggest Brands

Contact us for all Electric Vehicle Charging
Solutions and Accessories Across New Zealand & Australia.

EVSE believes in a green sustainable future by delivering the latest EV Charging technology at the lowest price. All our work is certified and guaranteed with the backing of global brands.

Our team of experts can provide specialist EVSE advice and are available to answer any of your questions over the phone

Find the right charger

Tell us about your car and home to see recommendations.

Get the best price

Stocking the best Electric Car products from the World’s leading brands.

Reliability

All of our EVSE products are compliant with New Zealand & International standards.