LTE Three Phase Installation | Under 5 m | Residential EV charger

Model
google-reviews

QUICK OVERVIEW

Three Phase EV Charger Installation under 5m

Length of cable run is from switchboard to location of charger. If the run is over 5m, the cost will be for a standard installation .

Purchase any of our EV Charger’s from our range and let the experienced team from EVSE sort out your residential installation for you.
Our nationwide network means that we have an expert EV installer in your area who can provide you with a cost-effective and safe installation of your EV charging station, compliant with Australian/ New Zealand standards and local regulations.

SKU: EVSE-RESI-8006

Purchase any of our EV Charger’s from our range and let the experienced team from EVSE sort out your residential installation for you.
Our nationwide network means that we have an expert EV installer in your area who can provide you with a cost-effective and safe installation of your EV charging station, compliant with Australian and New Zealand standards and local regulations.

Our Standard Installation Includes:

  • RCBO Type A protection device in the existing utility panel box
  • Under 5m Three-phase cable run – for cable run over 5m click here 
  • The charging station will be installed at customer preferred location per assessment
  • The charging station will be fully tested and certified as operational

Turnkey Residential Installation Process

  • The customer is contacted within 24 hours of an initial enquiry
  • EVSE organizes APP or site inspection
  • Install to be completed within 5 business days following install date confirmation.

Scope of Works

  • If work required exceeds the standard installation, EVSE offers an individual quote for further work.
  • The standardised installation makes provisions for single-phase connections with a charger installed within 5 meters of a buildings electrical box. The installation only makes provisions for a customer’s existing available electricity and does not include costs involved in having to upgrade a domestic electricity supply i.e. 3-phase when only single phase power available at the home.
  • Work to be conducted within normal business hours.

Not Included

  • Custom Work: Work outside of the scope of the standard installation described above will be at extra cost and sold by the EVSE Certified Installers directly to the consumer. EVSE has negotiated regional contractor pricing to ensure controls on pricing and customer experience.

Service Area

  • EVSE provides a nationwide installation service including regional areas.

Additional information

Weight 1 kg
phase

Three Phase

Model

Single Phase, Three Phase

Reviews

There are no reviews yet.

Be the first to review “LTE Three Phase Installation | Under 5 m | Residential EV charger”

Your email address will not be published. Required fields are marked *

Content not found.

Content not found.